Ref LOLER reg 9(3)(a)(iii)Checked November 2026
Written Scheme of Examination
Regulation 9(3)(a)(iii) of the Lifting Operations and Lifting Equipment Regulations 1998 lets you replace the fixed 6 and 12 month intervals with an examination scheme drawn up by a competent person. The scheme sets how often each item is examined, and what each examination involves, based on how the equipment is actually used.
A scheme can lengthen intervals for lightly used equipment, but it more often shortens them for heavily used or harshly treated kit. It must be in writing, specific to the equipment and reviewed when anything changes.
- Allowed by
- LOLER 9(3)(a)(iii)
- Drawn up by
- A competent personOften the examiner
- Typical cost
- £150 to £600Per site, ex VAT
- Review
- When use changesAnd at least as set in the scheme
Part 1
When a written scheme makes sense
- Large fleets or estates where usage differs widely between items of the same kind.
- Equipment in harsh conditions (ports, foundries, cold stores, outdoors) that needs examining more often than the minimum.
- Rarely used equipment where a competent person judges a longer interval to be safe.
- Complex equipment such as cranes, where the scheme can set out which parts are examined at each visit and which need testing.
Intervals must be based on a genuine assessment of risk. A scheme that stretches intervals without evidence, or is never reviewed, will not satisfy an HSE inspector and leaves you without the protection of the fixed intervals.
Written scheme fees
| Item | Typical fee |
|---|---|
| Scheme for a small site Up to about 20 items of familiar equipment | £150 to £300 |
| Scheme for a large site or crane Detailed scope by component | £300 to £600 |
| Annual review Usually at an examination visit | £0 to £150 |
Excluding VAT. Many examiners include a scheme in a regular examination contract.
Part 2
What a written scheme should contain
- The equipment it covers
- Each item identified by asset or serial number, with its safe working load and location.
- Intervals for each item
- How often each item, or each part of it, is examined, with the reasons.
- What each examination involves
- Parts to be examined, any dismantling, and any tests or non-destructive testing.
- Conditions of use assumed
- Duty cycle, environment and loads, so you can tell when they no longer apply.
- Triggers for review
- Changes in use, defects found, modifications or incidents that mean the scheme must be looked at again.
- Who wrote it
- The name and competence of the person who drew it up, and the date.
Want a written scheme for your equipment? Tell us what you have and we will find a competent person to draw it up.
Request an examinationPart 3
How a scheme is put in place
Build the equipment register
before bookingEvery item, its make, serial or asset number, safe working load, location and the date of its last report. Examiners price from the register, so a complete one gets you comparable quotes.
Usage review
site visitThe competent person looks at the equipment, how and how often it is used and its history of defects.
The written scheme
a few weeksIntervals and scope for each item, in writing, with the assumptions behind them.
Examine and review
ongoingEach examination follows the scheme, and the scheme is revised if use or condition changes.
Questions duty holders ask
What is a written scheme of examination?
A document drawn up by a competent person that sets the intervals and scope of thorough examinations for specific lifting equipment, used instead of the fixed 6 and 12 month periods in LOLER.
Who can write a scheme of examination?
A competent person with enough knowledge of the equipment and how it is used. It does not have to be the examiner, but often is.
Can a scheme make intervals longer than 12 months?
It can, if a competent person judges it safe from the evidence. In practice most schemes set intervals at or below the fixed periods.
Is a written scheme the same as one for pressure systems?
No. Pressure systems have their own written scheme of examination under the Pressure Systems Safety Regulations 2000. The idea is similar, but the law and the equipment are different.
Do I have to have a scheme?
No. You can simply follow the fixed intervals. A scheme is an option, and it must be followed once adopted.
Where our information comes from
Fee bands are our own reading of UK examiners’ published price lists and guides (2024 to 2026), which we do not name. Rules come from the regulations and HSE guidance below.
- Lifting Operations and Lifting Equipment Regulations 1998 (SI 1998/2307), legislation.gov.uk
- HSE: Thorough examinations and inspections of lifting equipment
- HSE L113: Safe use of lifting equipment, Approved Code of Practice and guidance
- HSE INDG422: Thorough examination of lifting equipment, a simple guide for employers
Request a written scheme of examination
Three short steps: where the equipment is, what it is, and how to reach you. About two minutes.
Thanks, your enquiry is in.
- We will email or call to tell you which lifting equipment examiner covers your sites and your kind of equipment.
- Your details reach that firm only if you say yes.